Manjung Simulator System Computer Complex





  • The Simulator System will simulate the Reference Plant including the Operator Consoles (Workstations), the Supervisory Consoles (Workstations), the OperateIT Servers, boiler and turbine trip buttons, Hard Panel Soft Simulation and the Sequence of Event Recorder. The DCS Engineering Workstation, the CCTV system and the large screen display will not be part of the Simulator System.The Simulator System will be identical to the topology indicated in figure below.

  • The Simulator System topology comprises of two (2) Simulator System LANs, i.e. the S-Net and the O-Net, both operating at 1000 Base-T or 1000 Mbps, and inter-connected via two (2) Real Time Data Servers (RTDS).